- Cost reduction: This is achieved thanks to the simplicity of the system and the rapidity in the manufacture, transport and assembly.
- Rapidity in mounting: 1.000 m2 of roof per assembly team in a week.
- Innovative designs: Innovativ des¡gns are achieved working with the span, the separation of the pillars or height.
- Roofs for aggressive environments: we guarantee that all the surface is galvanised.
- Maximum impermeability: Roof arches are continuous and overlap avoiding the use of joints.
- Absence of maintenance: Due to the quality of the raw materials used and its own system characteristics, maintenance work for preventing corrosion and leaking is not necessary.